Projects
Gruppo Renewable Energy has an active pipeline of projects in various stages of development. Below are descriptions of some current and upcoming Gruppo projects:
Air Liquide
Gruppo Designs and Constructs under a Lump-Sum Turnkey EPC Contracts:
Falmouth, MI
Feedstock agreement signed
EPC Contract signed
Preliminary design complete
Started: Q4 2023
Martinsburg, PA
In AL approval process
Preliminary design in-progress
Expected start: Q1-Q2 2024
South Dakota
- Expected start: Q3-Q4 2024
Air Liquide
Gruppo Designs, Builds, Owns and Operates:
Lancaster, PA
Dairy: Star Rock Farms
Herd Size: ~6,100 Holstein
CI Score: -303
Production: ~78,000 MMBtu/yr
Off-take: BP (or other strategic
partner)
Preble, NY
Dairy: Co-Vale Holsteins
Herd Size: ~5,300 Holstein
CI Score: -144
Production: ~64,000 MMBtu/yr
Off-take: BP (or other strategic
partner)
Comanche, TX
Dairy: Triple X Farms
Herd Size: ~7,900 Holstein
CI Score: -262
Production: ~114,000 MMBtu/yr
Off-take: BP (or other strategic
partner)
Add Your Heading Text Here
Add Your Heading Text Here
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Add Your Heading Text Here
Add Your Heading Text Here
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Your Heading Text Here
- Lorem ipsum dolor sit amet, consectetur adipiscing elit.
- Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.